Many older Granite Bay kitchens are ready for new stone and a larger island. Solid Construction & Design is a family-owned company that handles countertop installation in Granite Bay, including the design work. Our designers help you plan the island and the perimeter counters together.
Tell us a little about it. We’ll follow up within one business day.
Guiding Granite Bay homeowners through remodels with clarity.
The 1990s were Granite Bay’s busiest building decade, and the median home dates to 1987, according to U.S. Census estimates. Plenty of those kitchens may still carry their original tile or a busy speckled stone chosen three decades ago.
Owners replacing them often want a calmer pattern and a bigger island. The choice between engineered and natural stone comes down to how often you cook with high heat and whether you mind sealing once in a while.
Our designers help with slab and profile choices, and we take the template and order the stone. A fabricator cuts each section, and the installers carry the heavy pieces in and set them.
Your current tops are broken out and removed on install day. Licensed trades take the sink off and put it back once the stone is in, each task priced as its own quote line. In a gated neighborhood such as Los Lagos, you arrange entry for each visit.
Buyers in all price tiers may visit supplier yards near Sacramento to pick pieces whose color and veining agree across a large kitchen.
A digital template records every angle of a big U-shaped or galley layout, and the fabricator follows it so long counters line up.
The old counters stay in place during fabrication, so dinners and gatherings go on as planned.
Busy flecked stone is giving way to quieter surfaces in many remodels. Rate each stone on heat and scratch resistance first, and only then on pattern, because a beautiful slab still has to handle your cooking.
Installed: QuartzIsland and perimeter tops in a finished Granite Bay-area kitchen
Installed: GraniteDark tops against white shaker cabinetry, Granite Bay area
Installed: QuartziteLight veined tops in an open Granite Bay-area kitchen
Installed: MarblePale veined tops in a bright Granite Bay-area kitchen
Veining and color vary even within one stone, and quartz brands behave differently. For a large island, choosing the slab in person helps the pattern work across the whole top.
A thicker slab opens more choices, and the fabricator machines the profile at the shop. Mitered fronts give an island a substantial look. Rounded profiles are safer where children walk past the corners.
Prefabricated counters come in fixed sizes with a finished front and fit a small, straight run. Granite Bay kitchens with large islands or long perimeter runs need pieces cut out of whole slabs to the template.
For an island longer than one slab, custom work also decides where the single joint will fall.
Granite Bay homeowners see us twice on site, and all cutting stays at the shop. Step cards show what each stage involves and when you sign off.
In most homes the sink runs again by evening on install day, even with a large island going in.
Same-day removal & install
Big kitchens add up quickly, because stone is priced per square foot of finished surface, with fabrication on top. Total each counter’s length times depth in feet to get your area. Perimeter counters are about two feet deep, while islands vary.
Want a range for your own kitchen? The calculator below takes the square footage and the material, and updates live.
Quartz or granite in a straightforward layout
Quartzite, marble or a statement slab
Counters plus backsplash and waterfall
Figures are planning ranges for the region, not quotes. We price from a template. The estimate is free and there's no obligation.
Send us your estimate and we'll follow up with a tailored, no-obligation quote.
Your estimate is on its way to our team. We'll reach out shortly to schedule your consultation.
01
Quartzite and marble generally cost the most of the four materials. Rare colors and top grades add to any price.
02
A long island may need its own slab, and a large perimeter may need more. Every extra joint adds labor.
03
A softened square corner is standard. Mitered islands use more stone, and ogee shapes take extra milling time.
04
Every cutout adds cost. A prep basin in the island adds a second opening, and a sink mounted under the stone needs the edge of its opening polished.
05
Thick tile or an older stone top takes time to remove. Plumbing reconnection is priced on its own line.
Oleg and Roman Kravchuk, two brothers, have more than two decades of construction work behind them. Granite Bay owners can confirm the A+ Better Business Bureau rating the company has held since April 30, 2019.
The quote lists every charge and is signed ahead of cutting. Any change gets a written price and needs your approval.
One project manager oversees each run and the island, keeping the job on a dated schedule.
Solid works as a Class B general contractor under license CSLB #975441. Specialty trades are performed by licensed Class C subcontractors.
If the marble you love will etch on a busy island, we explain it while you can still choose another slab.
Six public review platforms make up the score, so you can read the comments.
Your countertops come with a 1-year installation warranty. California's 10-year standard for construction defects applies as well, and each product carries its manufacturer's warranty.
Click a phase for the work it involves and the choices that are yours. Your choices get settled near the start, so the remaining phases need little from you.
The starting point
Every project follows this path. Yours starts with a conversation.
Many kitchens from that decade went with heavily flecked stone. Granite countertop installation in Granite Bay now often means a quieter granite, and we compare it with quartzite while you choose.
A bigger island gives guests a place to gather near the cook. We plan the slab so the top has as few joints as possible.
Quartz countertop installation in Granite Bay appeals to families who want no sealing. We compare it with natural stone on heat tolerance and price.
A new stone island weighs a great deal. During our measuring visit, we check that the boxes can carry it and price any repair ahead of the order.
An installed figure here bundles the slab with all cutting and setting labor, with decorative profiles priced extra. Upkeep counts as much as price on a large island, because every square foot needs the same care.
| Material | Everyday wear | Sealing or maintenance |
|---|---|---|
| Quartz | It repels stains, yet direct heat can damage it. | It never needs sealing. |
| Granite | It withstands heat and daily scratches. | It needs periodic sealing. |
| Quartzite | It holds up to scratches better than granite. | It needs periodic sealing. |
| Marble | Acidic spills etch it, and it can stain. | It needs frequent sealing. |
A full-height stone backsplash behind the range uses more slab and adds cost. Suppliers price lots differently, so the firm figure comes once the template is complete.
Templates are only accurate when cabinets are level and well fastened. In a 1990s kitchen, our visit can also show whether an existing island base needs reinforcement for heavier stone.
Your quote and the shop’s cutting follow one set of measurements, so they agree.
No fee and no commitment come with the template. You then see each piece placed on the slab with joints marked and the fabrication price. Damage hidden under the old top can still change the scope.
This is a great opportunity not only to feel the materials, but also to get an idea or some inspiration.
You have probably seen most of it on a screen. Every cabinet, countertop, tile, and fixture Solid Construction & Design works with is there to touch and compare.
The showroom covers 28,000 square feet inside the Filco Superstore on Fulton Avenue, which makes it the largest design and appliance showroom in Northern California.
Bring a floor plan, a photo off your phone, or just an idea. A designer will pull samples with you and keep the choices within what you planned to spend.
Recent kitchen projects from Granite Bay and the nearest communities we have worked in. Each card opens the project: photos, scope and location.
Across 177 verified reviews on Google, Yelp, Angi, GuildQuality, Facebook & Houzz.
Here are the questions Granite Bay homeowners bring up most. Anything else can go through the form.
Granite Bay kitchens fall into three tiers: $3,200 to $5,800 for a standard slab, $6,400 to $11,500 for premium stone, and $12,000 to $24,000 for a full stone package. Premium stone is the usual choice, and a large island with waterfall ends often lands in the full package.
Most quartz or granite kitchens in Granite Bay fall in the premium stone tier, $6,400 to $11,500 installed. A small, simple layout can come in at the standard slab tier, $3,200 to $5,800. Removing the old tops and reconnecting the sink are listed separately.
Budget about 1 to 2 weeks for a standard slab, 2 to 3 weeks for premium stone, and 3 to 4 weeks for a full stone package. Setting the stone is one visit, and any cabinet repair comes ahead of it.
Granite Bay is unincorporated, so Placer County Building Services in Auburn issues its permits. County code lists counter tops as finish work, so a stone top that only replaces the old one may not need a permit. Our templating visit is where that gets settled for your house. Moving the sink or adding an island outlet can need one, and we apply for it.
The drive is about 20 miles, close to 31 minutes, to our 28,000-square-foot showroom inside the Filco Superstore at 1415 Fulton Ave in Sacramento. It holds stone samples for a side-by-side look with a designer. Full slabs are at supplier yards, open to every tier.
Yes. Countertop work covers Granite Bay (ZIP 95746) and nearby Roseville, Rocklin, Loomis, and Folsom. We serve 66 communities across Northern California, so check with us if your town is missing.
Original 1990s boxes that have sagged should be replaced, since stone needs a firm base. Custom cabinets and counters planned together share one quote. A full kitchen remodel suits owners who want to open the kitchen to the family room.
The whole room
Layout, cabinetry, counters and lighting handled as one scope, including the beam and the permit when a wall comes out.
What the tops sit on
Hardwood frames and doors, dovetailed drawer boxes, soft-close hardware, sized to your walls rather than to a catalogue.
Vanity tops too
Wet-area rebuilds done properly: waterproofing and ventilation to current code before any of the finishes go in.
South Placer
Roseville lies to the west and Folsom across the lake, and both are covered. Check the map to confirm your street.
Active City
Granite Bay
Placer County · CA
Solid’s Class B general contractor license is CSLB #975441, and its status is public on the CSLB website. Solid carries liability insurance of $1 million per occurrence and $2 million aggregate, plus workers’ compensation.
Solid is also an EPA Lead-Safe Certified Renovator. Census figures put 39% of the local housing stock ahead of 1980. Paint from before the 1978 lead ban may hide behind an old backsplash in those homes.
License #975441 · Active & verified
Accredited business since 2014
RRP certified · valid through April 2031
Remodeling Industry association
Kitchen & Bath Association
$1M per occurrence, $2M aggregate
Share a photo of the kitchen and the island size you have in mind. Our team will reply within one business day to set up our first visit to your home.
or call (916) 260-2066
Use the form to tell us about gate codes or entry rules in your neighborhood. That way, our first visit starts on time.
Or call (916) 260-2066
Evenings & Saturdays by appointment
$1M per occurrence, $2M aggregate · EPA Lead-Safe Certified Renovator